HVAC installation – Balham Leisure Centre

Specification: Swimming Pool AHU Replacement

Location: Balham Leisure Centre

Contract Value: Undisclosed

The installation was particularly challenging with regard to access as both the redundant and the new air handling units had to pass through a 2M x 1M opening.

To achieve this the new AHU unit was supplied in flatpack form and assembled in situ.

Scope Works:

  • Isolate electrical supplies to existing AHU.
  • Disconnect existing AHU Pipework.
  • Disconnect existing ductwork.
  • Supply and installation of flatpack thermal bridge AHU that was assembled on site.
  • Supply and installation of a plate heat exchanger.
  • Modifications to existing pipework to suit new AHU layout.
  • Modifications to existing ductwork connections to suit new AHU layout.
  • Supply and installation of Insulation.
  • Disconnect and remove vertical CAT ladder.
  • Supply and installation of new access stairway.
  • Mains power & Control wiring to plant.
  • Testing & commissioning of all new systems
  • Client handover completed Inc electronic/paper versions